top of page
St. Mary Magdalene Sanctuary
Apex, NC
This 40,000 sqf 2-story addition to the existing Catholic school consists of steel framing and cast-in-place concrete retaining walls.
Construction was completed in 2005.
bottom of page
Apex, NC
This 40,000 sqf 2-story addition to the existing Catholic school consists of steel framing and cast-in-place concrete retaining walls.
Construction was completed in 2005.